The gates will be opened on August 8th and remain open until the lake
reaches the target level of 7-feet below normal pool stage. The gates
will remain open for a period of 60 days once the drawdown level has
been achieved.
The lake is expected to drop approximately 4-inches a
day. It will take about two weeks to reach the drawdown level.